Race Works, Incorporated
OOPS. Your Flash player is missing or outdated.Click here to update your player so you can see this content.


Equipment
Race Works has all the equipment you need for your event, from safety pins to towering scaffolding and fencing. Our set up staff has years of race and event experience to assist in meeting all of your equipment requirements.

Single Scaffolding Tower
Starting Line ScaffoldingSingle Start line scaffolding used for cross country races and smaller 5K's, perfect for narrow trails or tight spaces.  The tower is 5ft X 7ft X 12ft and comes fully bannered with either stock RaceWorks banners or your custom sponsor banners.  We handle all the banner hanging and take down, so your volunteers do not need to climb on the scaffolding. 
 
Common Start and Finish Line Scaffolding
ScaffoldingStart and Finish line scaffolding with a 16ft. wide openning. Used to announce the start/finish line to particpants and give logo and name placement to sponsors.  All scaffolding towers are fully bannered with either stock RaceWorks Banners or your custom sponsor banners. 
 
Start or Finish Line Scaffolding
Start & Finish Line Scaffolding24ft. Wide start or finish line scaffolding, great for races with more than 3,500 runners. Shown with custom sponsor banners.
 
Truss System
20 Foot Truss SystemStart and Finish line structure spanning 10, 20, or 30 feet based on event size and venue. Finish line clocks can be hung from overhead. The Truss is a great place to hang custom banners for sponsor recognition.  The truss is on wheels and can be moved from the start to the finish line depending on the distance and length of the race.  Speakers for a sound system can be attached to the top to increase effectiveness of the announcer.   
 
Finish Line Clock
Finish Line ClockDisplayed at the finish line on either a tripod or hanging from the scaffolding for runners to see their final cumulative time.  This finish line clock is more visible in bright sunny conditions than an LED clock, because of it's bright yellow digits  It is battery powered and has a total run time of more than 9hrs on a full charge, it can also be run from AC power. 
 
Runners Chute Fence
Runners Chute FenceOur temorary start and finish line chute fence can be used to stage runners before the start and corral runners at the finish. The fence can also be used to display sponsor banners and signs , as shown in the picture above.
 
Results Scaffolding Tower
Image A single scaffolding tower near the finish line on which overall and age group awards are posted.  Stock RaceWorks banners are avilable but custom banners can provide addtional logo and name placement for sponsors.
 
Tents
TentsWe have tents in the following sizes: 10'x10' and 10'x20' pop-up tents are used for registration, packet pick-up, food distribution, and vendor sales. Special sizes and requirements are not a problem at RaceWorks Inc.
 
Pop-up Stage
Pop-up StageOur universal 4'x6' pop-up stage sits 5' high. It can be located at the Start or Finish line and used to elevate dignitaries and speakers. It can also be used for photographers and other media personnel.
 
Traffic Cones
ImageUsed for runner’s safety, lane closures and traffic control.  Typically a 5k route will use between 100 and 150 cones depending on the course.  Our cones meet all City of Austin and Texas Department of Transportation (TXDOT) regulations; they are 28in tall and have dual bands of 3M reflective tape.
 
Mile Markers
ImageSet up along the course at 1 Mile intervals. The split clock gives the runners their total time, from the start of the race. The mile markers stand 6 ft. tall and are highly visable.  The mile marker signs can be customized to give sponsors logo placement on the course; call for more details. 
 
RaceWorks Pace Truck
RaceWorks Pace TruckPace Car or Press Truck. Driven in front of the lead runner and used to help with timing and course organization.
 
Timing Clocks
Image Raceworks has a full line of timing clocks for any size event.  Split clocks or single sided clocks are used on the route at the mile markers to give the runners their over-all time from the start of the race.  Split clocks can also be used at the finish line on a tripod to give the runners thier final time and help with tear tag or card finishes.  Double sided hanging clocks are also available. 
 
Pace Car Clock
ImageUsed on the back of the pace truk to give the lead runners their time throughout the race. Clock has 6in tall digits and is visable from over 75ft. away.
 
Water Trailers
Set up strategically throughout the course to stage water stop supplies and provide hydration to runners. Place the trailer at the finish line for immediate hydration after the race; used in conjunction with our water coolers.
 
Flat Bed Trailer
Our 7'x18' Open-sided flatbed trailer can be used for bands or announcers. Great for press conferences and award cermonies. The safety rails are a great location to hang sponsor banners and signs.
 
6 ft. Set Up Tables
Use our six foot tables for registration and packet pick-up. They also make a great setting for post post-race food and refreshments.
 
Water Coolers
Image We have water coolers in 5 or 10 gallon capacity. They are used for runner hydration on the course and at the Start and Finish line. Great for deploying energy replacement drinks such as Powerade on the course. Our six foot tables are perfect for holding the coolers. We recommend 1-2 tables and 2-4 coolers per stop.
 
Runner Bibs and Safety Pins
ImageRaceWorks provides standard race numbers with tear tags and safety pins.  Bibs are sold per 100 and safety pins have 10 gross per box (1,440); each bib will require four safety pins.  The tear tag is required for non-chipped timed races and is helpful when drawing names for door prizes and giveaways.